Truman College Superstructure Chronicle

Saturday, August 1, 2009

Molding Preparation and Cement Work

Check out this small gallery of pictures depicting molding preparation and cement work. Brief explanatory notes are below each photograph.

http://www.caguila.com/caguila/moldingcement/index.html

All photographs copyright Christine Aguila 2009
Posted by Christine Aguila at 4:29 PM
Newer Post Older Post Home
View mobile version

Links

  • Christine Aguila's Web Site

Blog Archive

  • ▼  2009 (12)
    • ►  July (2)
    • ▼  August (8)
      • Protective Wall Along Truman/CTA Property Boundary
      • The Base of the Tower Crane
      • Molding Preparation and Cement Work
      • 1st Truman Construction Site Panorama--Warning!!!
      • The Slump Test
      • The Second Floor, The Elevator, The Foundation and...
      • July 13, 2009--First Day of Superstructure Constru...
      • A Look Back: August 2008 - August 2009
    • ►  September (2)
  • ►  2010 (6)
    • ►  January (1)
    • ►  July (4)
    • ►  November (1)
  • ►  2011 (1)
    • ►  January (1)
Awesome Inc. theme. Theme images by Airyelf. Powered by Blogger.