Truman College Superstructure Chronicle

Thursday, August 6, 2009

The Second Floor, The Elevator, The Foundation and Sewer Basin

Folks, check it out! Work has begun on the second floor! Click the link below for a gallery of photographs depicting the second floor, elevator, foundation, and sewer basin.


http://www.caguila.com/caguila/secondfloor/index.html


All photos copyright Christine Aguila
Posted by Christine Aguila at 6:53 PM
Newer Post Older Post Home
View mobile version

Links

  • Christine Aguila's Web Site

Blog Archive

  • ▼  2009 (12)
    • ►  July (2)
    • ▼  August (8)
      • Protective Wall Along Truman/CTA Property Boundary
      • The Base of the Tower Crane
      • Molding Preparation and Cement Work
      • 1st Truman Construction Site Panorama--Warning!!!
      • The Slump Test
      • The Second Floor, The Elevator, The Foundation and...
      • July 13, 2009--First Day of Superstructure Constru...
      • A Look Back: August 2008 - August 2009
    • ►  September (2)
  • ►  2010 (6)
    • ►  January (1)
    • ►  July (4)
    • ►  November (1)
  • ►  2011 (1)
    • ►  January (1)
Awesome Inc. theme. Theme images by Airyelf. Powered by Blogger.